Welcome to China - ASEAN mining information service platform! The platform has been brought into the frame work of China - ASEAN Informaiton Harbor, and also merged into the 100 major projects of "Belt and Road" initiative in Guangxi!
Current Location:Home  ->  Online Exposition  ->  Projects

Dashiqiao gold ore graphene deposit, Liaoning Province

Basic Info
Project Type Prospecting Right Validity period 2017-10-04
Location Dashiqiao City, Liaoning Province Area 0.5 square kilometers
Mineral Gold, lead, zinc, marble, and graphene ExplorationDegree
ResourceReserves Gold metal content (122b, 333)7113kg AverageGrade Unknown
Way of cooperation Transfer Quotation Negotiable
Project profile

Project overview: The mining rights area is 0.5km2, of which the No.6 gold ore body has a control length of 400m and a thickness of 2.0-6.0m. The tunnel mine controls the depth of the gold ore body to 150m and the average grade is 4.17-5.18g/t; in this interval 331, and 333, the gold metal reserves are (122b, 333) 7113kg, and the prospect (334) is 8000.00kg. There are six gold mineralized bodies with a length of over 400 meters, a thickness of 2.0-5.0 meters, a gold grade of 1.57~3.20g/t, a deep engineering control of 70 meters, and an estimated 333, and 334 gold mine resources of 3.47 tons. Conceal two kinds of cryptocrystalline graphite ore bodies, with a length of 300-400 meters, thickness of 25-30 meters, and carbon content 75-90%; The engineering controls ore body depth to 150 meters. The 331, and 333 graphite resources of 2 million tons. Two scale-like graphite ore bodies, with a length of 400 meters and a thickness of 20 to 30 meters, and the engineering control ore body depth at 150 meters.

 

Project coordinate
122.5071,40.64129
Existing data
None
Live photos
Company Name 北京戌金源矿业技术公司有限公司 Address 北京市朝阳区西大望路甲12号2号楼
Contacts 高树先 Address +86-15010271758
Mobile +86-15010271758 EMail 1729245749@qq.com